Process Automation — Chemical Industry/ Building Industry/ Metallurgy/ Transport of Bulk Material

Characteristically for this branch group, the big investment effort for new plants and the long-life cycle of plants makes the repeating migrations of automation systems necessary. The Factory Acceptance Test with WinMOD is an approved method which plans save commissioning and to minimize risks caused through software errors. A deepening of the process simulation in a WinMOD Project and a larger test deep before the commissioning are an important contribution for the assurance for short switch-time during migration.

With Shadow Plants it is possible to prepare optimizations of the control during the running business operation and operators can also be repetitive prepared for critical situations.





Chemical Industry

Video: Chemical Industry

Reference Article:

GEA Wiegand

Building Industry

 



 

Metallurgy



Transport of Bulk Material